case studies

MetroHealth Medical Center Case Study

Dec 6, 2019 10:47:29 AM
Case Studies

Site: MetroHealth Medical Center Cleveland, OH Application Overview: MetroHealth worked with EMH&T Engineers to develop a site utility plan that met Northeast Ohio Regional Sewer District (NEORSD)...

READ MORE →




Georgia Power Company Case Study

Dec 6, 2019 10:28:11 AM
Case Studies

Site: Georgia Power Company AP3 Landfill Macon, GA Application Overview: Georgia Power Company worked with Jacobs Engineering Atlanta office to design an erosion, sedimentation and pollution control...

READ MORE →




LIRR 3rd Track Constructors Urban Ave Case Study

Oct 25, 2019 10:31:27 AM
Case Studies

Site: North Hempstead, NY MTA Capital Construction Long Island Rail Road Application Overview: The LIRR Expansion project on Long Island, NY, is one of the region’s most significant transportation...

READ MORE →




LIRR 3rd Track Constructors Covert Ave Case Study

Oct 24, 2019 12:04:06 PM
Case Studies

Site: New Hyde Park, NY MTA Capital Construction Long Island Rail Road Application Overview: The LIRR Expansion project on Long Island, NY, is one of the region’s most significant transportation...

READ MORE →




The City of Dayton, Department of Aviation Case Study

Oct 24, 2019 11:29:34 AM
Case Studies

Site: City of Dayton Airport, OH Northwest Pump Station #PS7 Application Overview: The City of Dayton, Dept. of Aviation worked with Passero Associates and Norton Engineering to develop an...

READ MORE →




Washington Adventist Hospital Case Study

Oct 24, 2019 11:18:48 AM
Case Studies

Site: Washington Adventist Hospital Silver Spring, MD Application Overview: Washington Adventist Hospital worked with Soltesz Inc. to develop a utility water and sewer plan that met Washington...

READ MORE →




Fort Belvoir Fiberglass Integrated Traffic Rated Pump Station Case Study

Aug 14, 2018 11:45:00 AM
Case Studies

Site: Fort Belvoir, VA Fort Belvoir Military Base Application Overview: Excel Fluid Group designed and manufactured this pump station. Our solution to save installation time and risk, was to propose...

READ MORE →




Submersible Chopper Pump Reduces Pump Station Maintenance Costs



READ MORE →




NEORSD Stones Levee Pump Station Case Study

Feb 27, 2018 10:00:00 AM
Case Studies

Site: Cleveland, OH Stones Levee in The Flats Application Overview: Northeast Ohio Regional Sewer District (NEORSD) worked with MWH Engineers to design a new sanitary sewer pump station to replace an...

READ MORE →




Project Profile: Chevron Phillips Chemical Company

Apr 12, 2016 4:38:09 PM
Case Studies, 20 Duplex Basin Packages

Application: 20 Duplex Basin Packages

READ MORE →




« 1 ... 3 4 5 6 7 »

Subscribe Here!

New call-to-action