EFG-Color-Logo-full-name-tag
Submit a Project Inquiry

Blog

Hannahville Indian Health Service Pump Station Case Study

Industry: Commercial / Federal Challenge: The Hannahville Indian Community was in need of a reliable wastewater pump station to support their new community health and service facility long-term....

READ MORE →




How Large Can a Packaged Pump Station Be?

When engineers begin evaluating a pump station project, one of the first questions is often whether a packaged pump station can handle the required flow. The answer is typically “yes,” but the sizing...

READ MORE →




AEP Main St Lift Station Case Study

Industry: Sanitary Challenge: Kwest Group was tasked with delivering a sanitary lift station for an AEP substation project with specific standards and regulatory requirements. The original design...

READ MORE →




Design Assist Program: When to Utilize a Design Phase Partner for Pump Stations

Design Assist Pump Station Program EFG’s Design Assist Program was made for engineers and project managers who have a pump station as a part of their next project, but they may need engineering...

READ MORE →




Homewood Water Booster Pump Station Case Study

Industry: Municipal Challenge: The City of Pataskala needed a water booster station capable of pumping in two different directions. The system needed to be designed to transfer water between...

READ MORE →




Piketon Water Booster Pump Station Case Study

Industry: Municipal Challenge: The Village of Piketon was in need of a custom water booster station to increase flow and pressure to the area. Solution: Excel delivered a complete packaged booster...

READ MORE →




Pump Station Applications in the Aviation Industry

Pump Station Applications in the Aviation Industry Airports are a big business with landing fees, fuel fees, baggage fees, and more. The airlines that operate there know it, with the more gates they...

READ MORE →




NCDOT Northampton Pump Station Case Study

Industry: Municipal Challenge: A new sanitary wastewater system was needed to support the US-158 widening project in Garysburg, North Carolina. The replacement system had to be fully installed before...

READ MORE →




Monticello, IL Pump Station Case Study

Jun 13, 2026, 10:00:00 AM
Case Studies, municipal pump station, municipal

Industry: Municipal Challenge: The City of Monticello needed a pump station with a unique engine configuration capable of operating both pumps instead of relying on standard designs. Solution: Excel...

READ MORE →




Chicago O'Hare T5 Parking Garage Pump Station Case Study

Jun 3, 2026, 11:00:00 AM
Case Studies, NoVault, Stormwater Application, Aviation

Industry: Aviation Challenge: The Chicago O'Hare International Airport was in need of a new stormwater solution for their massive parking garage with over 1,700 parking spaces. Solution: Excel was...

READ MORE →




1 2 3 4 5 ... 15 »

Subscribe Here!

New call-to-action