EFG-Color-Logo-full-name-tag
Submit a Project Inquiry

Blog

Excel Fluid Group

Recent Posts

Homewood Water Booster Pump Station Case Study

Industry: Municipal Challenge: The City of Pataskala needed a water booster station capable of pumping in two different directions. The system needed to be designed to transfer water between...

READ MORE →




Piketon Pump Station Case Study

Industry: Municipal Challenge: The Village of Piketon was in need of a custom water booster station to increase flow and pressure to the area. Solution: Excel delivered a complete packaged booster...

READ MORE →




NCDOT Northampton Pump Station Case Study

Industry: Municipal Challenge: A new sanitary wastewater system was needed to support the US-158 widening project in Garysburg, North Carolina. The replacement system had to be fully installed before...

READ MORE →




Monticello, IL Pump Station Case Study

Jun 13, 2026 10:00:00 AM
Case Studies, municipal pump station, municipal

Industry: Municipal Challenge: The City of Monticello needed a pump station with a unique engine configuration capable of operating both pumps instead of relying on standard designs. Solution: Excel...

READ MORE →




Chicago O'Hare T5 Parking Garage Pump Station Case Study

Industry: Aviation Challenge: The Chicago O'Hare International Airport was in need of a new stormwater solution for their massive parking garage with over 1,700 parking spaces. Solution: Excel was...

READ MORE →




Eaton Lane Pump Station Case Study

Industry: Municipal Challenge: Recurring flooding near Eaton Lane in West Islip, New York required a stormwater solution. Bayside site conditions, limited site access, capped electric service, and...

READ MORE →




Andrews Air Force Base Water Booster Pump Station Case Study

Industry: Federal & Military Challenge: The Andrews Air Force Base in Maryland was experiencing low, inconsistent water pressure. This issue raised concerns for both daily operations and long-term...

READ MORE →




State Center, IA Pump Station Case Study

Industry: Municipal Challenge: The City of State Center, Iowa sought upgrades to its failing wastewater collection system and evaluated multiple approaches to replace aging infrastructure. The city...

READ MORE →




Indian River County Pump Station Case Study

Apr 20, 2026 1:30:00 PM
Case Studies, Pump Controls, HDPE, Leachate

Industry: Landfill Challenge: The Indian River County Landfill required additional leachate collection infrastructure to support increased site capacity. Located in Florida, the project’s design...

READ MORE →




Stones Levee 2 Pump Station Case Study

Industry: Municipal Challenge: Rapid redevelopment in The Flats area of Cleveland required The Northeast Ohio Regional Sewer District (NEORSD) to replace and relocate an existing pump station on an...

READ MORE →




1 2 3 4 5 ... 11 »

Subscribe Here!

New call-to-action