EFG-Color-Logo-full-name-tag
Submit a Project Inquiry

Blog

Pittsburgh International Airport Case Study | Excel Fluid Group

May 28, 2024 11:30:00 AM by: Excel Fluid Group



Pittsburgh International Airport - Concrete Station - 500x333Site:

Pittsburgh, PA

Pittsburgh International Airport Concrete Pump Station

Application Overview:

In collaboration with BKG Industries and HDR, we designed an sanitary pump station for the Pittsburgh International Airport.

Pump Station Details:

Our team constructed this prefabricated concrete pump station, measuring 12 feet deep. Excel Fluid Group factory-assembled all internal components within the wet well, including piping and valves. The system features two explosion-proof Barnes SITHE chopper pumps, all managed by an Excel duplex control panel.

DOWNLOAD THE PDF

Installation:

The installation was completed by BKG Industries with the oversight of Excel Fluid Group as shown below:









Subscribe Here!

Submit a Project Inquiry