R+L Carriers - Matteson, IL Case Study

Nov 1, 2022 10:00:00 AM by: Excel Fluid Group



RL Carriers - NoVault Complete 200x200Site:

Matteson, IL

Ramar Land Corp. with Manhard Consulting

New R+L Freight Terminal

Application Overview:

We worked with R+L Carriers, Ramar Land Corp., and with Manhard Consulting to design this sewage pump station at a new R+L Carriers freight terminal in Matteson, IL. With limited space available, the small footprint of the NoVault™ NV2 design allowed for a perfect fit next to a property fence. This continues our long standing relationship working with Manhard Consulting on packaged pump station solutions.

Pump Station Details:

An Excel Fluid Group factory build prepackaged pump station with a 5 ft. X 23.5 ft. HDPE wet well and a NoVault NV2 enclosure with 3 in. HDPE piping and a duplex ArcSentry™ control panel. It uses Barnes 4 in. Explosion Proof Submersible SITHE Chopper pumps that are rated at 71 GPM @ 42 TDH. The chopper design is the ideal solution to handle the toughest wastewater applications.

DOWNLOAD THE PDF

Installation:

The installation was completed by Winninger Excavating with oversight from Excel Fluid Group as shown below: