MetroHealth Medical Center Case Study

Dec 6, 2019 10:47:29 AM by: Excel Fluid Group



Metro InstallSite:

MetroHealth Medical Center

Cleveland, OH

Application Overview:

MetroHealth worked with EMH&T Engineers to develop a site utility plan that met Northeast Ohio Regional Sewer District (NEORSD) standards for their new medical campus transformation project located near downtown Cleveland. The new MetroHealth 11-floor hospital will be LEED certified, surrounded by 25 acres of green space and connected to the Cleveland MetroParks Towpath trail for patients, visitors and staff to enjoy

Pump Station Details:

Excel Fluid Group supplied the sanitary pump station per the project specifications which included the following: (1) 8’ x 27’ concrete wet well, (2) Wilo 7.5 hp submersible pumps rated for 410 GPM, (1) JWC ‘Muffin Monster’ electric influent grinder to macerate large solids and (1) PumpVision universal pump controller to operate the pumps & grinder.

DOWNLOAD THE PDF

Installation:

The installation was completed by The Great Lakes Construction Company as shown below:









Subscribe Here!

Lunch-and-Learn-Request-CTA