Application Overview:

We collaborated with Pinnacle Construction & Development Group to design and construct eight pump stations, deliver three control packages, and perform two valve vault reconfigurations at various locations within Cuyahoga Valley National Park. These pump stations are designed to collect all sanitary wastewater and pump it off-site to the local sewer system.

Pump Stations Details:

  • Happy Days: 4 ft. diameter by 10 ft. deep Fiberglass Wet Well, Duplex Control Panel, 2 Flygt Pumps
  • Ledges North: 3.5 ft. diameter by 12 ft. deep Fiberglass Wet Well, Duplex Control Panel, 2 Flygt Pumps
  • Octagon: 3.5 ft. diameter by 9 ft. deep Fiberglass Wet Well, Duplex Control Panel, 2 Flygt Pumps
  • Garage: 3.5 ft. diameter by 7.5 ft. deep Fiberglass Wet Well, 2 Flygt Pumps, Duplex Control Panel
  • Muar: HDPE Submersible Simplex Station, 2 Flygt Pumps
  • Kendall Lake: 6 ft. diameter by 11 ft. deep Concrete Wet Well, 2 E/One Pumps, Duplex Control Panel
  • Pine Hollow: Concrete Submersible Station, 2 E/One Pumps
  • Duffy: Concrete Submersible Station, 2 E/One Pumps, Duplex Control Panel
  • November Lodge, Sagar, & Howe Meadow: Control Packages
  • Stanford House & Johnson Rohde: Concrete Valve Vault Reconfigurations

 