EFG-Color-Logo-full-name-tag
Submit a Project Inquiry

Blog

Cleveland Hopkins International Airport Case Study | Excel Fluid Group

Mar 27, 2024 1:15:00 PM by: Excel Fluid Group



Cleveland Hopkins International Airport -Fiberglass Station - 500x333Site:

Cleveland, OH

Cleveland Hopkins International Airport

Application Overview:

In collaboration with CHA and Mr. Excavator, we designed an industrial wastewater pump station for Sherwin-Williams’ new building 404 at Cleveland Hopkins International Airport.

Pump Station Details:

Our team engineered and constructed this prefabricated 17-foot-deep duplex fiberglass pump station. Excel Fluid Group factory-installed all internal components within the wet well, including piping and valves. The system features two Barnes submersible grinder pumps, all managed by an Excel duplex control panel, pumping all the way to Brook Park Road.

 

DOWNLOAD THE PDF

Installation:

The installation was completed by Mr. Excavator with the oversight of Excel Fluid Group as shown below:









Subscribe Here!

Submit a Project Inquiry