ODOT SR 64 Bowling Green Case Study

Jan 13, 2020 3:41:36 PM by: Excel Fluid Group



ODOT SR64 InstallSite:

ODOT SR 64 Project 180408
Bowling Green, OH

Application Overview:

ODOT / City of Bowling Green worked with Poggemeyer Design Group and DLZ Inc. to convert the Two existing SR64/SR105 signalized ramp intersections at I-75 to single lane roundabouts, which included a new sanitary pump station adjacent to (BGSU) Bowling Green State University.

Pump Station Details:

Excel Fluid Group was contracted to supply and install the sanitary pump station per the project specifications which included the following: (1) 8’ x 30’ concrete wet well, (2) Flygt submersible pumps, (1) Easi-Set concrete controls building and all associated VFDs, control panels, flow-meter and air release valve.

DOWNLOAD THE PDF

Installation:

The installation was completed by Miller Bros. Construction Inc., Norwalk Concrete and Excel Fluid Group as shown below: