Anne Arundel County, MD Case Study

Mar 16, 2020 10:00:00 AM by: Excel Fluid Group



Anne Arundel County - Complete Pump Station - 200x200Site:

Anne Arundel County, MD

Gannett Fleming

Lothian Elementary School

Application Overview:

We worked with Gannett Fleming to design a turn-key pump station solution that would replace an existing, failing pump station for Anne Arundel County. The turn-key integrated fiberglass pump station arrived to site, prefabricated with it’s aluminum hatch doors and safety grates, HDPE piping, cast iron valves installed and ready to connect.

Pump Station Details:

We met Anne Arundel County’s standards with a 6 ft. diameter by 14 ft. deep wet well with an integrated 6 ft. by 5 ft. valve vault. Handling the waste was two 3 in. Sulzer-ABS submersible pumps running off of transducer and float backup controls. It was also equipped with 10 and 8 in. PVC vents to help the build up of sewage gasses. To complete the station, a chain-linked fence surrounded the pump station as it was at a school.

DOWNLOAD THE PDF

Installation:

The installation was completed by Gradient Construction as shown below: