Data centers rely on more than server racks, cooling towers, air handling units, and liquid cooling systems to operate reliably. Managing cost per gallon and cost per watt is essential to overall data center efficiency. Behind the scenes, specialized pump stations support safe, compliant operations by managing thermal cooling loops, cooling water supply, industrial wastewater, and sanitary wastewater requirements. Because these systems operate around the clock, efficient pump performance is critical. The right solutions help prevent servers and chip overheating, control water and energy costs, and protect the uptime of critical computing equipment. 

By managing stormwater, sanitary wastewater, and graywater reuse needs, pump stations help keep data center sites resilient and operational. Drawing on experience with large-scale data center projects, Excel Fluid Group designs and delivers reliable solutions that support regulatory compliance and long-term performance with offsite manufacturing. This allows the pump station manufacturing to happen in parallel with the data center construction. We work closely with design-build contractors and site developers to deliver packaged systems on schedule, within budget, and engineered for redundant operations. This all helps data centers come online earlier and begin revenue-generating operations sooner compared to field assembled pump systems.

Wastewater and Stormwater Stations

New data centers often rely on traditional pump station designs for industrial wastewater, cooling tower blowdown, and stormwater infrastructure. The appropriate design and cost depend on factors such as site size, drainage requirements, local regulations, and project budget.

Sanitary Wastewater Lift Stations

Primarily designed for future operations, these lift stations collect wastewater from facility bathrooms and maintenance areas, then elevate it to nearby gravity sewer lines that connect to the local utility.

Stormwater and Retention Pump Stations

Data center sites often require a stormwater pump station to remove surface water from areas without adequate drainage and help prevent flooding. These systems manage heavy runoff from expansive roof areas and paved substation yards, helping protect critical site infrastructure.

Grinder Pump Packages

Grinder pump packages are used in domestic-waste applications to macerate solids within designated drainage zones before conveying them through force mains to local utility networks.

Utility and Site Water Station

New data center facilities can face water management challenges once operations commence. Packaged solutions that increase water pressure or reuse available raw water can improve water efficiency and support reliable facility operations.

Water Booster Stations

To keep consistent performance, water booster pump stations can help maintain consistent municipal or process water pressure for Phase 1 cooling loops and other general facility operations.

Rainwater / Graywater Harvesting Stations

Potentially in collaboration or integrated with stormwater or retention pump stations, rainwater and graywater harvesting stations can recycle and safely pump alternative water sources into non-potable cooling makeup loops.

Cooling and Thermal Management Pump Stations

Cooling and thermal management pumps circulate liquid or refrigerant through data center systems to remove waste heat. Selecting the right pump helps maintain safe operating temperatures, reduce the risk of chip overheating, and improve energy efficiency in demanding mechanical and computing environments. 

Chilled Water Circulation Stations

Often described as the lifeblood of a data center, chilled water circulation stations are a critical part of data center cooling infrastructure, distributing chilled water from central chillers to computer room air handlers (CRAHs) and in-row cooling units to help remove heat from critical equipment.

Condenser Water Loop Stations

A condenser water loop circulates water between an HVAC chiller’s condenser and an external heat-rejection device, such as a cooling tower. The loop absorbs heat from the refrigerant and transfers that thermal energy outdoors.

Glycol / Specialized Coolant Stations

Glycol-based specialized coolant systems are closed-loop thermal systems that circulate water mixed with ethylene or propylene glycol. They help prevent overheating and corrosion while providing precise temperature control.

Condensate Removal Units

Condensate removal units collect and discharge excess water generated by air conditioners, high-efficiency furnaces, and boilers.

Project Challenges Solved

Pryor, OK – PRY9A Data Center Campus Pump Station

Located within the MidAmerican Industrial Park, Building 9 is a 1.4-million-square-foot facility that will house a new data center. Scheduled to begin operations in 2026, the packaged monolithic structures were designed to meet the client’s request for operational flexibility in managing industrial wastewater.
  • Multi-structure custom duplex packaged pump station with one HDPE receiving manhole, two HDPE wet wells, one HDPE valve vault and one HDPE meter vaults with H20 traffic rated aluminum hatches 
    • Receiving manhole: 10 ft. diameter by 17 ft. deep HDPE tank with 14 in. and 15 in. pipe penetrations
    • HDPE wet wells: Two 10 ft. diameter by 24 ft. deep HDPE tanks with 14 in. and 24 in pipe penetrations
    • Valve vault: 8 ft. diameter by 8 ft. deep HDPE tank with 8 in. pipe penetrations
    • Meter vault: 6 ft. diameter by 8 ft. deep HDPE tank with 8 in. pipe penetrations
  • Two Barnes Envie3 submersible explosion proof solids-handling pumps designed to deliver 1,080 GPM @ 122 TDH each
  • 8 in. ductile iron discharge piping and fittings prefabricated in the structures
  • Two 15 in. and one 24 in. pump station slide gate assembly

Frederick County, MD – Multiple Bauxite Data Center Pump Stations

For a new data center campus in Maryland, the facility will sit on 112 acres of land with the buildings encompassing 822,620 and 591,913 square feet respectively.  Excel Fluid Group partnered to design and build multiple pump stations to manage industrial process wastewater of the two buildings at the site.

  • Bauxite II
    • Conventional 12 ft. diameter by 20 ft. deep concrete pump station with a 10 ft. diameter by 6.5 ft. deep concrete valve vault with H20 traffic rated aluminum hatches
    • Three Grundfos submersible sewage pumps designed to deliver 400 GPM @ 75 TDH
    • 8 in. ductile iron discharge and valve vault piping and valves
    • NEMA 4X 460V triplex control panel complete with a variable frequency drive and primary controls via level transducer with a backup relay control back up system via control floats
  • Bauxite III
    • Conventional 12 ft. diameter by 25 ft. deep concrete pump station with a 8 ft. diameter by 9 ft. deep concrete valve vault with H20 traffic rated aluminum hatches
    • Three Grundfos explosion-proof submersible pumps designed to deliver 600 GPM @ 173 TDH
    • 6 in. ductile iron discharge and valve vault piping and valves
    • NEMA 4X 460V Three Phase triplex control panel complete with a variable frequency drive and primary controls via level transducer with a backup relay control back up system via control floats

Sandusky, OH – Aligned Neo Data Center

Moving into a former automotive bearings and parts manufacturing plant is Aligned’s NEO-01 data center, the first of four planned facilities. Designed for sanitary wastewater service, the NoVault™ NV3 pump station will support the 120-acre hyperscale campus.
  • Excel designed prefabricated aluminum duplex above ground NoVault™ NV3 pump station enclosure with a polymer concrete flat top and wet well hatch
  • 8 ft. diameter x 23 ft. deep concrete pump station
  • Two Barnes Envie3 submersible SITHE chopper pumps
  • 6 in. ductile iron discharge and above grade valve piping
  • Excel designed 208-230V Three Phase ArcSentry™ control panel with across the line starters within the NV3 enclosure

Richland Parish, LA – RPL-10x Data Center Campus Industrial Wastewater Treatment Facility

Created to support a new 4-million-square-foot data center campus, this pump station will manage domestic wastewater generated on site. Initial site work began in December 2024, with ongoing expansions and multiple development phases planned through 2030–2032.
  • 3 ft. diameter by 10 ft. deep fiberglass pump station with an aluminum wet well cover and access hatch
  • Two Barnes Razor submersible grinder pumps
  • 2 in. Schedule80 PVC discharge piping and valves
  • NEMA 4X 460V duplex control panel complete with a variable frequency drive and primary controls via level transducer with a backup relay control back up system via control floats

Lima, OH – LMA1A Pump Station

Also known as Project BOSC, this new data center campus encompasses 200 to 370 acres. For the project, Excel Fluid Group designed a temporary process and domestic sanitary wastewater pump station comprised of two wet wells, one receiving manhole, and two NoVault™ pump station enclosures. Construction of the project began in 2026, with completion targeted for 2030.
  • Pump Station Structures
    • Two Excel designed prefabricated aluminum duplex above ground NoVault™ NV3 pump station enclosures with a polymer concrete flat top and wet well hatches
    • Two 10 ft. diameter x 25.75 ft. deep concrete wet wells
    • Four Barnes submersible explosion-proof chopper pumps
    • 6 in. ductile iron discharge and above grade valve piping
    • Two Excel designed 208-230V Three Phase ArcSentry™ control panel with a variable frequency drive and primary controls via level transducer with a backup relay control back up system via control floats within the NV3 enclosures
  • Receiving Manhole
    • 12 ft. diameter by 18.5 ft. deep concrete manholes

New Albany, OH – HJS 1A Data Center Pump Station

Located within the New Albany International Business Park, Excel Fluid Group designed a simplex stormwater pump station using a NoVault™ pump station enclosure. The data center originally became operational in 2021. Our design provides the team with the flexibility to transition to a duplex configuration if higher flow capacity is required in the future. 
  • Excel designed prefabricated aluminum duplex above ground NoVault™ NV3 pump station enclosure with a polymer concrete flat top and wet well hatch
  • 8 ft. diameter x 16 ft. deep concrete pump station
  • One Barnes submersible explosion-proof solids handling pumps
  • 6 in. HDPE discharge and above grade valve piping
  • Excel designed 208-230V Three Phase ArcSentry™ control panel with across the line starters within the NV3 enclosure

Dona Ana County, NM – Project Miner Data Center Pump Station

 
At a new 1,400-acre data center campus featuring four data center buildings, microgrids, natural gas plants, and a desalination facility, Excel Fluid Group worked with Kiewit to design a packaged sanitary wastewater lift station. The system collects and conveys wastewater from the campus to the downstream collection system.
  • 5 ft. diameter by 35.5 ft. deep fiberglass pump station with two 6 ft. diameter by 7 ft. deep separate valve vaults
  • Two Sulzer Piranha grinder submersible pumps
  • 3 in. Schedule80 PVC discharge piping and valves

We hope this helps give you a better understanding of how to Excel Fluid Group can support your next data center project with packaged pump stations. Get a budget proposal on your next pump station with our online Pump Station Budget Calculator tool. Plus see what can affect your pump station's cost in our blog post. If you have any questions about your next pump station design, contact us today!