ODOT SR 64 Project 180408
Bowling Green, OH
ODOT / City of Bowling Green worked with Poggemeyer Design Group and DLZ Inc. to convert the Two existing SR64/SR105 signalized ramp intersections at I-75 to single lane roundabouts, which included a new sanitary pump station adjacent to (BGSU) Bowling Green State University.
Excel Fluid Group was contracted to supply and install the sanitary pump station per the project specifications which included the following: (1) 8’ x 30’ concrete wet well, (2) Flygt submersible pumps, (1) Easi-Set concrete controls building and all associated VFDs, control panels, flow-meter and air release valve.
The installation was completed by Miller Bros. Construction Inc., Norwalk Concrete and Excel Fluid Group as shown below: