Blog | Excel Fluid Group

Hemlock Creek Watershed Case Study

Written by Excel Fluid Group | Jul 15, 2020 12:00:00 PM

Site:

City of Seven Hills, OH
Hemlock Creek Watershed

Application Overview:

City of Seven Hills worked with CT Consultants to design new utility improvements for the Hemlock Creek Watershed. This project included a new sanitary sewer pump station that was required to meet Seven Hills Engineering Dept. standards.

Pump Station Details:

An Excel Fluid Group pump station with a 5’ x17’ concrete wet well, aluminum NoVault enclosure and Barnes SGV Series 2 Hp Grinder pumps was deemed most suitable for this application. The Excel NoVault satisfied the client’s concern about confined space hazards as all service can be performed at grade by opening the enclosure gull-wing doors.

Installation:

Fabrizi Trucking & Paving Inc. completed the installation as shown below: