Challenge:
Kwest Group was tasked with delivering a sanitary lift station for an AEP substation project with specific standards and regulatory requirements. The original design required further coordination and adjustments to align with site needs.
Solution:
Excel analyzed the initial set of plans and provided recommendations to improve the system's effectiveness. The team worked with the project partners to move the project through approval, ultimately supplying a fiberglass wet well to support the sanitary station.
Pump Station Details:
Fiberglass Wet Well with Integrated Valve Vault, Duplex Control Panel with NEMA 4X Steel Enclosure, BARNES Sewage Ejector Wastewater Pumps
EngineerFounded in 1946, this multidisciplinary consulting firm brings together over 200 professionals to deliver comprehensive architectural, civil engineering, and land surveying solutions across the Great Lakes region. Operating from 11 locations across Michigan, Indiana, and Ohio, the company champions a client-focused approach centered on the core philosophy that business is fundamentally all about people. |
|
|
|
ContractorKwest Group is an employee-owned civil engineering and heavy civil construction contractor headquartered in Perrysburg, Ohio. The company specializes in earthwork, underground utilities, and site infrastructure development across the energy, rail, and public works industries. |
Pump Station End UserOperating as one of the largest investor-owned electric utilities in the United States, American Electric Power (AEP) delivers electricity to 5.6 million customers across 11 states. The company owns approximately 32,000 megawatts of generation capacity and manages the nation's largest electricity transmission network stretching 40,000 miles. |
The Challenge:
Kwest Group was tasked with delivering a sanitary lift station for an AEP substation project that had to comply with AEP's standards and applicable state and local requirements. With defined installation expectations, the project required close coordination to ensure all components aligned with the provided specifications and supported a reliable sanitary system. The initial design plans required additional coordination to fully address site requirements and system needs.
The Solution:
Building on previous work together, Kwest reached out to Excel for pump station-specific expertise and to assist with bringing the design into alignment. The team conducted a thorough review of the initial plans and developed recommendations to help improve the design for system needs and regulations.
Working alongside Kwest and Wightman, Excel helped redefine the design and guide it through the approval process. Once finalized, a 72” diameter, 162” deep fiberglass wet well was supplied to support the sanitary lift station, providing a reliable foundation for long-term operation.