---
title: West Shore Drive Case Study | Excel Fluid Group
description: In collaboration with U.P. Engineers & Architects, we designed a wastewater pump station for West Shore Dr. in Munising, Michigan. The new system replaces a failing septic system that serviced a three -story hotel located along the shore of Lake Superior.
---

[Blog | Excel Fluid Group ](https://www.excelfluidgroup.com/blog)

# [West Shore Drive Case Study | Excel Fluid Group](https://www.excelfluidgroup.com/blog/west-shore-drive-case-study-excel-fluid-group)

 Written by [Excel Fluid Group](https://www.excelfluidgroup.com/blog/author/excel-fluid-group) | Oct 18, 2023 2:45:00 PM

## <https://www.excelfluidgroup.com/hubfs/Case%20Studies%20(PDF%20Files)/78%20EFG%20Case%20Study%20-%20West%20Shore%20Dr..pdf>Site:

Munising, MI

West Shore Drive GIT Lift Station

## Application Overview:

In collaboration with U.P. Engineers & Architects, we designed a wastewater pump station for West Shore Dr. in Munising, Michigan. The new system replaces a failing septic system that serviced a three -story hotel located along the shore of Lake Superior.

## Pump Station Details:

Our team constructed a turnkey duplex submersible pump station, featuring a 6 foot diameter by 15 feet deep HDPE wet well and two ABS XFP submersible pumps (212 GPM @ 53.8 TDH). The station includes a 20 foot by 10 foot insulated fiberglass building housing a NEMA control panel with VFDs, PLC/HMI, level transducer, and redundant float switches, along with a skid-mounted Cummins propane standby generator with automatic transfer switch to ensure continuous operation. Prefabricated internal piping includes a 4 inch ductile iron discharge header, Mag flow meter, air-release valve, and isolation/bypass connections, all factory-assembled, performance-tested, and delivered ready for site installation.

## Installation:

The installation was completed by Smith Construction with the oversight of Excel Fluid Group as shown below:

[View full post](https://www.excelfluidgroup.com/blog/west-shore-drive-case-study-excel-fluid-group)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Excel Fluid Group"
  },
  "dateModified" : "2026-04-14T19:56:30.414Z",
  "datePublished" : "2023-10-18T14:45:00Z",
  "headline" : "West Shore Drive Case Study | Excel Fluid Group",
  "image" : {
    "@type" : "ImageObject",
    "height" : 333,
    "url" : "https://5401901.fs1.hubspotusercontent-na1.net/hubfs/5401901/Case%20Study%20Images/West%20Shore%20Drive%20Complete%20Pump%20Station%20-%20500x333.png",
    "width" : 500
  },
  "mainEntityOfPage" : "https://www.excelfluidgroup.com/blog/west-shore-drive-case-study-excel-fluid-group",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Blog"
  }
}
```