Plain City, OH
New Housing Development at Madison Meadows
Sandstone Wrapped Duplex NoVault Pump Station
We worked with CT Consultants to design a new wastewater pump station for a new housing development in Plain City, OH. With it being in a residential area, we worked to make it as unnoticeable as possible. We accomplished by eliminating the valve vault with the NV3 pump station enclosure. From there we put a sandstone wrap around the enclosure and power pedestal to help it blend into its environment.
We used an 8 ft. diameter by 35 ft. deep concrete wet well with a NoVault NV3 pump station and two Barnes explosion-proof submersible chopper pumps. For ease of maintenance, a lifting crane was provided above the hatch doors. It’s all controlled by the ArcSentry™ control panel complete with touch screen operator interface, and transducer and float switch level controls.
The installation was completed by E.C. Babbert Inc. with consulting from Excel Fluid Group as shown below: