---
title: Madison Meadows Case Study | Excel Fluid Group
description: Learn more about the Excel Fluid Group team's recent experience working on the Madison Meadows NoVault NV3 pump station in this case study.
---

[Blog | Excel Fluid Group ](https://www.excelfluidgroup.com/blog)

# [Madison Meadows Case Study | Excel Fluid Group](https://www.excelfluidgroup.com/blog/madison-meadows-pump-station-case-study)

 Written by [Excel Fluid Group](https://www.excelfluidgroup.com/blog/author/excel-fluid-group) | Apr 12, 2022 2:00:00 PM

## <https://www.excelfluidgroup.com/hubfs/Case%20Studies%20(PDF%20Files)/36%20EFG%20Case%20Study%20-%20Madison%20Meadows.pdf>Site:

Plain City, OH

New Housing Development at Madison Meadows

Sandstone Wrapped Duplex NoVault Pump Station

## Application Overview:

We worked with CT Consultants to design a new wastewater pump station for a new housing development in Plain City, OH. With it being in a residential area, we worked to make it as unnoticeable as possible. We accomplished by eliminating the valve vault with the NV3 pump station enclosure. From there we put a sandstone wrap around the enclosure and power pedestal to help it blend into its environment.

## Pump Station Details:

We used an 8 ft. diameter by 35 ft. deep concrete wet well with a NoVault NV3 pump station and two Barnes explosion-proof submersible chopper pumps. For ease of maintenance, a lifting crane was provided above the hatch doors. It’s all controlled by the ArcSentry™ control panel complete with touch screen operator interface, and transducer and float switch level controls.

## Installation:

The installation was completed by E.C. Babbert Inc. with consulting from Excel Fluid Group as shown below:

[View full post](https://www.excelfluidgroup.com/blog/madison-meadows-pump-station-case-study)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Excel Fluid Group"
  },
  "dateModified" : "2026-04-14T19:58:06.524Z",
  "datePublished" : "2022-04-12T14:00:00Z",
  "headline" : "Madison Meadows Case Study | Excel Fluid Group",
  "image" : {
    "@type" : "ImageObject",
    "height" : 333,
    "url" : "https://5401901.fs1.hubspotusercontent-na1.net/hubfs/5401901/Case%20Study%20Images/Madison%20Meadows%20-%20Pump%20Station%20-%20500x333.jpg",
    "width" : 500
  },
  "mainEntityOfPage" : "https://www.excelfluidgroup.com/blog/madison-meadows-pump-station-case-study",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Blog"
  }
}
```