---
title: Fort Bragg SERE Training Complex Case Study
description: Learn more about the Excel Fluid Group team's recent experience working on the Fort Bragg, NC SERE Training Complex NoVault Pump Station in this case study
---

[Blog | Excel Fluid Group ](https://www.excelfluidgroup.com/blog)

# [Fort Bragg SERE Training Complex Case Study](https://www.excelfluidgroup.com/blog/fort-bragg-sere-training-complex-case-study)

 Written by [Excel Fluid Group](https://www.excelfluidgroup.com/blog/author/excel-fluid-group) | Jun 15, 2022 1:40:43 PM

## <https://www.excelfluidgroup.com/hubfs/Case%20Studies%20(PDF%20Files)/32%20EFG%20Case%20Study%20-%20SERE%20Training%20Complex%20-%20Fort%20Bragg.pdf>Site:

Fort Bragg, NC

SERE Training Complex

NoVault Pump Station

## Application Overview:

We worked with American States Utilities Services, Inc. (ASUS) to design a new wastewater pump station for a new tactical training facility at the SERE Training Complex in Fort Bragg, NC. There was only a small lot of land where a pump station could fit. To accommodate this limitation, ASUS and Fort Bragg went with the 3 ft. x 4 ft. NoVault pump station that eliminates the need for a separate valve vault or and minimizes utility easement requirements..

## Pump Station Details:

With the limited space available, we fit a 6 ft. diameter by 15 ft. deep HDPE wet well on a NoVault pump station. Two 15 HP Barnes 3 in. submersible grinder pumps are rated to pump 120 GPM at 175 TDH. It’s all controlled by an ArcSentry™ duplex control panel with a Milbank NEMA 3R Aluminum Power Pedestal and Cummins 60kW Skid Mount Diesel Generator.

## Installation:

The installation was completed by Locke-Lane Construction with consulting from Excel Fluid Group as shown below:

[View full post](https://www.excelfluidgroup.com/blog/fort-bragg-sere-training-complex-case-study)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Excel Fluid Group"
  },
  "dateModified" : "2026-05-06T15:43:04.361Z",
  "datePublished" : "2022-06-15T13:40:43Z",
  "headline" : "Fort Bragg SERE Training Complex Case Study",
  "image" : {
    "@type" : "ImageObject",
    "height" : 333,
    "url" : "https://5401901.fs1.hubspotusercontent-na1.net/hubfs/5401901/Case%20Study%20Images/Fort%20Liberty%20-%20Pump%20Station%20-%20500x333.jpg",
    "width" : 500
  },
  "mainEntityOfPage" : "https://www.excelfluidgroup.com/blog/fort-bragg-sere-training-complex-case-study",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Blog"
  }
}
```