Anne Arundel County, MD
Gannett Fleming
Lothian Elementary School
We worked with Gannett Fleming to design a turn-key pump station solution that would replace an existing, failing pump station for Anne Arundel County. The turn-key integrated fiberglass pump station arrived to site, prefabricated with it’s aluminum hatch doors and safety grates, HDPE piping, cast iron valves installed and ready to connect.
We met Anne Arundel County’s standards with a 6 ft. diameter by 14 ft. deep wet well with an integrated 6 ft. by 5 ft. valve vault. Handling the waste was two 3 in. Sulzer-ABS submersible pumps running off of transducer and float backup controls. It was also equipped with 10 and 8 in. PVC vents to help the build up of sewage gasses. To complete the station, a chain-linked fence surrounded the pump station as it was at a school.
The installation was completed by Gradient Construction as shown below: